
The Faith Energy take
Announced in April 2026 and not yet shipping: ChargePoint's next DC platform, with megawatt-class site architecture and native vehicle-to-everything support. We are tracking availability through our distributor channel — if your 2027 capital planning includes corridor or depot charging at this scale, we can design the electrical infrastructure now so the site is ready when hardware ships.
Quotes include the complete bill of materials — equipment, make-ready assumptions, networking, and commissioning — reviewed by our engineers against your site.
Ask an engineer about this unit